Skip to main content
Loading…
This section is included in your selections.

A. Right-of-way for pedestrian paths and activity trails at locations other than within the right-of-way for streets and utilities may be required as a condition of subdivision approval. Activity trails shall be provided for as shown on the Activity Trail Master Plan that was adopted by City Council. Pedestrian paths may be required where pedestrian routes would otherwise be more than one-quarter (1/4) of a mile longer if the pedestrian path were not provided.

B. All right-of-way for pedestrian paths shall be at least ten feet (10') in width. All right-of-way for activity trails shall be at least fourteen feet (14') in width. Right-of-way for pedestrian paths and activity trails shall be dedicated by one (1) of the adjacent lots, and shall be required to be maintained and serviced by the adjacent lot that provided the dedication for the pedestrian path or activity trail. The plat shall specifically designate the lot that provided the dedicated right-of-way and shall designate said lot owner to provide service and maintenance for the pedestrian path or activity trail. (Ord. 2576, 7/27/10; Ord. 2389, 4/22/08)