Skip to main content
Loading…
This section is included in your selections.

A. A Street and Utility Construction Permit is required and shall be obtained before uncovering, connecting to, opening into, altering, or disturbing any municipal improvement.

B. A waste discharge permit is required and shall be obtained from the City and the Department of Ecology before a significant industrial user discharges wastewater into the POTW.

C. A plumbing permit is required and shall be obtained before a building sewer is installed, except for building sewers that are installed outside of the City’s corporate limits. (Ord. 2642, 2/14/12)