Skip to main content
Loading…
This section is included in your selections.

A. Since stormwater is part of the street improvements, the applicant shall install the stormwater improvements in accordance with MLMC 17.24.030. A.

B. The City Engineer may approve plans submitted by the applicant’s engineer to divert or enclose natural drainage in and through the subdivision. The applicant shall bear all costs associated with diverting or enclosing natural drainage.

C. All storm drainage in City streets shall drain from the asphalt to concrete gutters, then to approved stormwater structures such as catch basins and drywells. All stormwater between stormwater structures shall be in underground pipes.

D. Washington State Department of Ecology approval is required for all stormwater facilities before construction plans will be approved. (Ord. 2823, 9/13/16; Ord. 2576, 7/27/10; Ord. 2390, 4/22/08)