Skip to main content
Loading…
This section is included in your selections.

Water service installed by the City of Moses Lake along Central Drive and Evelyn Drive in Section 15, Township 19 North, Range 28 East, W.M. under the Central Drive Road and Utility Construction Project, shall be assessed on the properties as shown below. The charge shall be paid upon property subdivision except for Parkplace Plat, application of a building permit, or upon request to connect to city water. Water shall not be turned on or be allowed to remain turned on if the charge is not paid. The charge shall be a portion for the regular permit fee for water services as required by ordinance. The reimbursement shall be placed in Fund 477.

Grape Drive Ball Field Plat

$16.79/front foot

Parkplace - Lot 1

$ 11,000/building plus

($55,120.34 maximum for lot)

$0.50/S.F. building area

Parkplace - Lot 2

$ 14,000/building plus

($77,963.88 maximum for lot)

$0.60/S.F. building area

Parcel 1, Lot 3, Parkplace Plaza Major Plat Binding Site Plan

$2,760

Parcel 2, Lot 3, Parkplace Plaza Major Plat Binding Site Plan

$10,631

Parcel 3, Lot 3, Parkplace Plaza Major Plat Binding Site Plan

$8,855

Park Orchard Tract 13 less tax parcels

$5,527.60

Park Orchard Tract 8

$1,075.00/service

(connect to stubout)

Park Orchard Tract 29

$15.91/front foot

Tax #12550

$1,075.00/service

(connect to stubout)

(Building area is the total area encompassed by the exterior footings of the building.) (Ord. 2171, 7/27/04; Ord. 1732, 1996)