Skip to main content
Loading…
This section is included in your selections.

A separate and independent building sewer shall be provided for every building and subdivided lot, each with separate connection to the POTW, with the following exceptions:

A. When separate buildings are an integral part of a single business or industry and are located on the same lot.

B. When separate buildings are under the same ownership and located on the same lot.

C. When buildings are located within a binding site plan and the buildings are connected to a private sewer main.

D. When buildings are located within a planned development district zone and the buildings are connected to a private sewer main. (Ord. 2642, 2/14/12)