Skip to main content
Loading…
This section is included in your selections.

All measurements, tests, and analyses of the characteristics of wastewater shall be performed in accordance with the Standard Methods for the Examination of Water and Wastewater by a Department of Ecology accredited laboratory. The samples shall be taken at the control manhole, when installed. When a specific control manhole is not required, the sample location shall be taken at the nearest downstream manhole in the POTW. When requested by the Municipal Services Director, a user shall submit information on the nature and characteristic of its wastewater to assure full compliance with this chapter. Samples taken to meet the requirements of this chapter shall be representative of the volume and nature of the test parameters, including representative sampling of any unusual discharge or discharge condition. All costs associated with testing and analyses shall be borne by the user. (Ord. 2642, 2/14/12)